Works involved working closely with Tom Willoughby to assist in removing a redundant water tower from Bewerly Park.
The tower which had an AIB ceiling was made safe prior to the lift. The water tower was unsafe to access in situ so a lifting plan was drawn up and the tower lifted into a safe area ready for asbestos removal.
Once the Asbestos ceiling had been removed and passed the 4-stage clearance the remainder of the tower was dismantled and recycled.